The Ministry of Finance will borrow Y7.31 billion to finance a project under the Department of Rural Roads to build a bridge over the Chaopraya river in Nonthaburi, a province next to
The Mass Rapid Transit Authority of Thailand will borrow Y16.64 billion to finance the second phase of construction of an electric rail project, known locally as the Purple line. The 25-year term loan, to be guaranteed by the Ministry of Finance, will be at an annual interest rate of 1.4%. It has a seven- year grace period.
Since 1968,
The loan plan has been approved by the Thai cabinet in April.